A roofing estimate template that prices per square, tear-off through cleanup.

This is a free roofing estimate template with a full roof replacement already itemized: tear-off and prep, deck and sheathing repair, underlayment and waterproofing, the shingle install, ridge ventilation and gutters, permits, labor, cleanup, and contingency at the end. It prices the way roofers price: tear-off and field shingles per square, flashing and ridge by the linear foot, penetrations each. Load it in the builder, delete what the roof doesn't need, and put your numbers on what's left. Every rate field starts empty, because per-square rates vary by market.

Deck condition can't be judged from the driveway, which is why this template ships with a flat deck inspection line, sheathing replacement quoted per 4x8 sheet, and a second layer removal line for roofs with two layers. Most roofing templates online are static PDFs; this one opens as a working estimate you can add lines to.

9 sections · 48 line items·Rates left blank·No sign-up

What’s in the template

This is the exact checklist that loads in the builder, with each line’s unit already set. Delete what this job doesn’t need.

Tear-Off & Prep6 lines

Shingle tear-off and second layer removal priced per square, flashing and gutter removal by the linear foot, plus tarping and the surface prep sweep before anything new goes down.

  • Existing Shingle Tear-Offsquare
  • Second Layer Removalsquare
  • Flashing & Trim Removalln ft
  • Gutter Removalln ft
  • Roof Protection & Tarpingflat
  • Surface Prep & Nail Sweepsquare

Roof areas quoted per square (100 sq ft).

Deck & Sheathing Repair6 lines

What the tear-off uncovers: a deck inspection, sheathing replacement per 4x8 sheet, rafter and truss repair, fascia and soffit, and re-nailing the decking that stays.

  • Roof Deck Inspectionflat
  • Sheathing Replacementsheet
  • Rafter / Truss Repairln ft
  • Fascia Board Replacementln ft
  • Soffit Repairln ft
  • Re-Nail Existing Deckingsquare

Sheathing quoted per 4x8 sheet; framing runs per linear foot.

Underlayment & Waterproofing6 lines

Ice and water shield, synthetic or felt underlayment by the square, valley membrane, and drip edge for both eave and rake.

  • Ice & Water Shieldsquare
  • Synthetic Underlaymentsquare
  • Felt Underlaymentsquare
  • Valley Membraneln ft
  • Drip Edge - Eaveln ft
  • Drip Edge - Rakeln ft

Coverage areas quoted per square; valley and eave runs per linear foot.

Roofing Material & Install8 lines

Architectural shingles per square, starter strip and hip and ridge cap by the linear foot, and every flashing on the roof: step, wall, pipe boots, chimney, skylight.

  • Architectural Shingles - Installsquare
  • Starter Strip Shinglesln ft
  • Hip & Ridge Cap Shinglesln ft
  • Step Flashingln ft
  • Wall & Counter Flashingln ft
  • Pipe Boot / Vent Flashingeach
  • Chimney Flashingeach
  • Skylight Flashing Kiteach

Field roofing quoted per square (100 sq ft); starter and hip/ridge per linear foot.

Ridge Ventilation & Gutters7 lines

Ridge vent and soffit intake by the linear foot, box and powered vents each, plus gutter runs, downspouts, and guards by the linear foot.

  • Ridge Ventln ft
  • Static / Box Ventseach
  • Turbine / Powered Venteach
  • Soffit Intake Ventsln ft
  • Seamless Guttersln ft
  • Downspoutsln ft
  • Gutter Guardsln ft

Ridge vent and gutter runs quoted per linear foot; roof penetrations each.

Permits & Fees4 lines

The roofing permit, inspection fee, dumpster rental, and equipment mobilization: flat lines the job pays for either way.

  • Roofing Permitflat
  • Inspection Feeflat
  • Dumpster / Roll-Off Rentalflat
  • Equipment Mobilizationflat

Labor4 lines

Day rates for the roofing crew, foreman, deck-repair carpenter, and laborer, priced as crew size times days.

  • Roofing Crewday
  • Foreman / Supervisorday
  • Carpenter - Deck Repairday
  • Laborerday

Unit: day. Quantity = # crew, multiplier = # days.

Cleanup & Disposal5 lines

Debris haul-off, landfill fees by the ton, the magnetic nail sweep for the lawn, landscape cleanup, and a final inspection walk.

  • Debris Removal & Haul-Offflat
  • Disposal / Landfill Feeston
  • Magnetic Nail Sweepflat
  • Site & Landscape Cleanupflat
  • Final Inspection Walkflat

Contingency & Allowances2 lines

A contingency allowance for whatever the tear-off finds and the workmanship warranty, each carried as a line.

  • Contingency Allowanceflat
  • Workmanship Warrantyflat

Overhead & profit is the percentage modifier, not a line.

Questions

Units, tax, deposits and exports are covered in the Help guide.

For the longer answer, there’s a guide: How to Write a Construction Estimate.

What does a roofing job estimate include?

Nine sections in the order the job runs: tear-off and prep, deck and sheathing repair, underlayment and waterproofing, roofing material and install, ridge ventilation and gutters, permits and fees, labor, cleanup and disposal, and contingency and allowances. Inside them are the lines that fall off quotes and stay on jobs: roof protection and tarping, drip edge on the rake as well as the eave, the chimney flashing, landfill fees billed by the ton. Delete what this roof doesn't need and price the rest.

How do I price a roofing job?

Per square, mostly: tear-off and the field shingles both carry a per-square rate, the same hundred square feet the whole trade bids in. Linear feet carry the perimeter and the breaks: starter strip, hip and ridge cap, valley membrane, drip edge, step flashing. Penetrations go each: pipe boots, the chimney, the skylight. Labor prices as crew size times days. What moves your number is layers coming off, deck condition, and how much ridge and valley the roof has. The live P&L runs alongside, so you know your floor before negotiating.

How do I handle bad decking I can't see until tear-off?

Price it before you see it. The template carries a flat roof deck inspection line, sheathing replacement quoted per 4x8 sheet, and rafter and truss repair by the linear foot, so bad decking enters the estimate as a stated assumption instead of a mid-job phone call. There's a contingency allowance under Contingency & Allowances for the rest. If the tear-off reveals more sheets than you guessed, you change a quantity, not the structure of the document.

Is the roofing estimate template free?

Yes. The whole builder runs without an account, and every estimate export is on the free plan: client PDF, Excel, CSV, an internal budget export for your own numbers, and a read-only share link that carries a client-safe copy inside the link itself. A free account stores one estimate in the cloud. Pro is a one-time purchase, not a subscription: your branding on client exports, no Estimatery footer, invoice exports, unlimited cloud saves, and a Saved Items catalog of your standard lines. If your client expects the word quote, this is the roofing quote template too: it's the same document.

Related general contractor templates

General information for pricing your own work. Not legal, tax or accounting advice. Deposit caps, licensing, lien and permit rules vary by state.

The checklist is done. Add your rates.
Loads with all 48 lines. No sign-up.