A concrete estimate template with the whole job itemized, excavation through cleanup.

This is a free concrete estimate template with the whole job already itemized: excavation and site prep, base and subgrade, forming and rebar, the pour itself, finishing and curing, sealing and waterproofing, permits and labor, cleanup, and overhead. Load it in the builder, delete what your job doesn't need, and put your rates on what's left. The rates ship blank because they're yours, and they vary by market.

Most concrete quote templates are four rows and a signature line. A pour has a pump day, a short-load charge, and a washout that has to go somewhere. Lines left off the estimate still happen on the job and get paid for out of your margin.

9 sections · 59 line items·Rates left blank·No sign-up

What’s in the template

This is the exact checklist that loads in the builder, with each line’s unit already set. Delete what this job doesn’t need.

Excavation & site prep8 lines

Layout and staking, mass and trench excavation, grading, compaction, dewatering, and erosion control.

  • Site Layout & Stakingflat
  • Clearing & Grubbingsq ft
  • Mass Excavationcu yd
  • Footing Trench Excavationln ft
  • Rough Gradingsq ft
  • Soil Compactionsq ft
  • Dewatering / Sump Pumpday
  • Erosion Controlflat

Base & subgrade7 lines

Gravel base supplied and placed, crushed stone, sand leveling, vapor barrier, and underslab insulation. Aggregate by the yard or the ton, depending on how your supplier bills.

  • Gravel Base - Supplycu yd
  • Gravel Base - Place & Compactcu yd
  • Crushed Stone Fillton
  • Sand Leveling Layercu yd
  • Vapor Barriersq ft
  • Rigid Foam Underslab Insulationsq ft
  • Subgrade Grading & Screedsq ft

Aggregate by loose volume (cu yd) unless supplier bills by weight (ton).

Forming & reinforcement8 lines

Footing and wall forms set and stripped, rebar supplied and tied, wire mesh, anchor bolts, and dowels. Supply and labor sit on separate lines because they're separate costs.

  • Footing Forms - Setln ft
  • Wall / Edge Forms - Setln ft
  • Form Strippingln ft
  • Rebar - Supplyln ft
  • Rebar - Tie & Placeln ft
  • Wire Meshsq ft
  • Anchor Bolts & Embedseach
  • Dowels & Chairseach

Concrete supply & pour7 lines

Ready-mix by the cubic yard, footing, wall, and slab pours, the pump day, and the short-load charge.

  • Ready-Mix Concrete - Supplycu yd
  • Footing Pourcu yd
  • Foundation Wall Pourcu yd
  • Slab Pourcu yd
  • Concrete Pumpday
  • Vibrating & Consolidationcu yd
  • Short-Load / Overtime Chargeflat

Volume ordered by loose cubic yard delivered.

Finishing & curing8 lines

Screed, float, trowel, and broom finishes, control and expansion joints, edge detailing, curing compound, and wet-cure days.

  • Screed & Floatsq ft
  • Trowel Finishsq ft
  • Broom Finishsq ft
  • Control Joint - Cutln ft
  • Expansion Joint - Installln ft
  • Edge & Corner Detailingln ft
  • Curing Compoundgal
  • Wet Cure & Protectionday

Sealing & waterproofing6 lines

Sealer, waterproof membrane, damp-proof coating, protection board, perimeter drain tile, and backfill.

  • Concrete Sealergal
  • Foundation Waterproof Membranesq ft
  • Damp-Proof Coatingsq ft
  • Protection Boardsq ft
  • Perimeter Drain Tileln ft
  • Backfill & Compactcu yd

Permits & labor7 lines

Building permit, engineering and soils report, inspections, mobilization, crew and finisher day rates, and equipment rental. Crew lines price as headcount times days.

  • Building Permitflat
  • Engineering & Soils Reportflat
  • Footing / Foundation Inspectionflat
  • Mobilizationflat
  • Concrete Crewday
  • Finishersday
  • Equipment Rentalday

Crew unit: day. Quantity = # crew, multiplier = # days.

Cleanup & disposal5 lines

Spoils haul-off, concrete washout, the debris dumpster, final grade, and site cleanup.

  • Spoils Haul-Offcu yd
  • Concrete Washoutflat
  • Debris Dumpsterflat
  • Final Grade & Site Restorationsq ft
  • Site Cleanupflat

Contingency & Allowances3 lines

General conditions, a contingency allowance, and insurance and bonding. Carried as a flat line or a percentage.

  • General Conditionsflat
  • Contingency Allowanceflat
  • Insurance & Bondingflat

Enter allowances flat. Overhead & profit is the percentage modifier, not a line.

Questions

Units, tax, deposits and exports are covered in the Help guide.

For the longer answer, there’s a guide: How to Write a Construction Estimate.

What does a concrete job estimate include?

Nine sections that follow the job in order: excavation and site prep, base and subgrade, forming and reinforcement, concrete supply and pour, finishing and curing, sealing and waterproofing, permits and labor, cleanup and disposal, and contingency and allowances. Inside them are the lines that get eaten when they're forgotten: the vapor barrier, the pump day, the short-load charge, the spoils haul-off. Delete what your pour doesn't need.

How do I price a concrete job?

Line by line. Concrete carries its price in a handful of drivers: yards of mix, linear feet of forms and rebar, square feet of finish, crew days, and whatever the soil turns out to be. Every line in the template prices as rate times quantity times multiplier, whatever the unit label says, and your margin updates as you go. The number at the bottom holds up because every piece of it is a line someone can point to.

How do I handle contingency and deposits on a concrete estimate?

The template ships with a contingency and allowances section: general conditions, a contingency allowance, and insurance and bonding, carried as flat allowance lines. If you price overhead as a straight percentage instead, the document-level overhead and profit fee does that on the subtotal. For deposits, the builder has an informational deposit line you can add to the document, so the client sees what's due up front without it changing the total.

Is the concrete estimate template really free?

Yes. The whole builder works without an account, and the free plan includes every estimate export: client PDF, Excel, CSV, an internal budget export, and a read-only share link that carries a client-safe copy inside the link. A free account adds one cloud-saved estimate. Pro is a one-time purchase, not a subscription: your branding on client exports, no Estimatery footer, invoice exports, unlimited cloud saves, and a Saved Items catalog of your standard lines.

Related general contractor templates

General information for pricing your own work. Not legal, tax or accounting advice. Deposit caps, licensing, lien and permit rules vary by state.

The checklist is done. Add your rates.
Loads with all 59 lines. No sign-up.