A bathroom remodel estimate template with demolition through finish already itemized.

This is a free bathroom remodel estimate template with the whole job already itemized: demolition and disposal, framing, plumbing, electrical and ventilation, waterproofing, tile, vanity and glass, finishes, and the permits and contingency lines at the end. Load it in the builder, delete what the job doesn't call for, and put your rates on what's left. The rates ship blank because they're yours, and they vary by market.

Bathroom remodel estimates go wrong in the lines that don't show in the finished photos: the waterproof membrane, the blocking behind wall-mounted fixtures, the debris that leaves by the cubic yard. A bathroom renovation estimate with four rows and a total leaves those out, and the difference comes out of your margin.

9 sections · 55 line items·Rates left blank·No sign-up

What’s in the template

This is the exact checklist that loads in the builder, with each line’s unit already set. Delete what this job doesn’t need.

Demolition & Disposal8 lines

Tear-out from fixtures to flooring, plus the site protection, dumpster, and haul-away lines.

  • Fixture Removaleach
  • Vanity & Countertop Removaleach
  • Tile Demolitionsq ft
  • Flooring Tear-Outsq ft
  • Drywall Removalsq ft
  • Site Protectionflat
  • Dumpster Rentalflat
  • Debris Haul-Awaycu yd

Framing & Structural5 lines

What the demo uncovers: wall and subfloor repair, blocking for fixtures, niche framing, and reframing openings.

  • Wall Framing Repairln ft
  • Subfloor Repairsq ft
  • Blocking For Fixtureseach
  • Niche Framingeach
  • Window/Door Reframeeach

Plumbing8 lines

Rough-in through final connections, with separate lines for relocating drains, setting the toilet, and every fixture install.

  • Rough-In Plumbingflat
  • Supply Line Replacementln ft
  • Drain Relocationeach
  • Shower Valve Installeach
  • Toilet Seteach
  • Sink & Faucet Installeach
  • Tub Installeach
  • Final Plumbing Connectionsflat

Electrical & Ventilation7 lines

Rough-in wiring, GFCI outlets, lighting, the exhaust fan, and heated floor wiring by the square foot.

  • Rough-In Wiringflat
  • GFCI Outletseach
  • Vanity Light Installeach
  • Recessed Lightingeach
  • Exhaust Fan Installeach
  • Switch & Dimmer Installeach
  • Heated Floor Wiringsq ft

Waterproofing & Substrate5 lines

Backer board, membrane, shower pan, and seam sealing.

  • Cement Backer Boardsq ft
  • Waterproof Membranesq ft
  • Shower Pan Installeach
  • Seam & Corner Sealingln ft
  • Floor Underlaymentsq ft

Tile & Surfaces6 lines

Floor, shower, and surround tile by the square foot, trim and edging by the linear foot, grout and seal to close it out.

  • Floor Tile Installsq ft
  • Shower Wall Tilesq ft
  • Tub Surround Tilesq ft
  • Accent/Niche Tilesq ft
  • Tile Trim & Edgingln ft
  • Grout & Sealsq ft

Unit: sq ft for tiled areas; ln ft for trim/edge pieces.

Vanity, Fixtures & Glass6 lines

Vanity cabinet, countertop, mirror, medicine cabinet, shower glass enclosure, and the accessory installs at the end.

  • Vanity Cabinet Installeach
  • Countertop Installsq ft
  • Mirror Installeach
  • Shower Glass Enclosureeach
  • Accessory Installeach
  • Medicine Cabinet Installeach

Finishes7 lines

Drywall patch, paint, baseboard and trim, door install, caulk, final cleanup, and a general labor line by the day.

  • Drywall Patch & Finishsq ft
  • Wall & Ceiling Paintsq ft
  • Baseboard & Trimln ft
  • Door Installeach
  • Caulk & Sealantflat
  • Final Cleanupflat
  • General Laborday

Permits & Contingency3 lines

Building permit, mobilization, and a contingency allowance for conditions behind the walls.

  • Building Permitflat
  • Mobilizationflat
  • Contingency Allowanceflat

Overhead & profit is the percentage modifier, not a line.

Questions

Units, tax, deposits and exports are covered in the Help guide.

For the longer answer, there’s a guide: How to Write a Construction Estimate.

What does a bathroom remodel estimate include?

Nine sections in the order the job runs, demolition and disposal through finishes, with permits and contingency at the end. In between: framing and structural, plumbing, electrical and ventilation, waterproofing and substrate, tile and surfaces, and vanity, fixtures and glass. Inside them are the lines that get skipped and invoiced later: site protection, blocking for fixtures, seam and corner sealing, debris haul-away. Delete what your job doesn't need.

How do I price a bathroom remodel?

Line by line, from your side of the job. Demo scope, tile square footage, how far the plumbing moves, and fixture count drive most of the number, and each one has its own line here. Every line is rate times quantity times multiplier, so a rate change flows straight through the total. Overhead and profit is built in as a document-level fee on the subtotal.

How do I handle contingency and deposits on a bathroom remodel estimate?

The template ships with a contingency allowance line, because you don't know what's behind the tile until the tile is gone. Priced as a line, it's in the total from the start. For deposits, the builder supports an informational deposit line at the document level, plus the overhead and profit fee as a percentage of the subtotal and a discount.

Is the bathroom remodel estimate template really free?

Yes. The builder works without an account, and every estimate export works on the free plan: client PDF, Excel, CSV, an internal budget export, and a read-only share link. Pro is a one-time purchase, not a subscription: your branding on client exports, no Estimatery footer, invoice exports, unlimited cloud saves, and a Saved Items catalog of your standard lines.

Related general contractor templates

General information for pricing your own work. Not legal, tax or accounting advice. Deposit caps, licensing, lien and permit rules vary by state.

The checklist is done. Add your rates.
Loads with all 55 lines. No sign-up.